Defence Barracks

Defence Barracks

Defence Barracks Carpark Client: Department of Defence Duration: 1 week  Scope of Works Strip and remove organic material.  Supply quarry rubble for sub-base re-instatement, ensuring proper cross-fall for water runoff.   Resurface a 56m by 41m carpark with...
AWB Grainflow

AWB Grainflow

AWB Grainflow Civil Works Client: Cargill Duration: 3 weeks Scope of Works Yearly ongoing rehabilitation of grain facility preceding South Australian broad-acre farming. Grade and resheet all access roads, widening roads where applicable. Supply of all materials....
Ngaut Ngaut Access Reinstatement

Ngaut Ngaut Access Reinstatement

Ngaut Ngaut Access Reinstatement Client: Department of Environment and Water Duration: 2 weeks Scope of Work: The late 2022 Murray River flood caused significant damage to areas adjacent the river, including National Parks and Wildlife parks. Ngaut Ngaut Conservation...
South Australian Police Horse Facilities

South Australian Police Horse Facilities

South Australian Police Horse Facilities Client: Department of Infrastructure and Transport & BESIX Watpac Duration: 8 weeks Scope of Work: This development was urgently required to temporarily relocate 10 horses from the Thebarton Police Barracks to allow for the...
South Australian Police Baffle Installation

South Australian Police Baffle Installation

South Australian Police Baffle Installation Client: South Australian Police Date: July 2023 Duration: 4 months Scope of Work: Civil works will be undertaken to elevate the ground for sniper positions and install engineer-designed overhead baffles at both the 200m and...